Skip to main content
#OFFSHORE EQUIPMENT

TRANSPORT & TRANSFER
OF THREE MANIFOLD STRUCTURES

IN SHORT
VESSEL Fairpartner
CARGO 3 x subsea manifolds and foundations
POL Batam, Indonesia
POD Dampier, Australia
PROJECT Gorgon Extension
SPECIALS
  • Full project management
  • Part of the subsea development of the Gorgon II / Jansz field in Australia
  • Direct transfer on installation vessel
  • Seafastening design and supply arranged by Jumbo according to clients standards
  • Full adherence to Australian quarantine rules and regulations (including drydock) Covid-19 challenges
PROJECT SUMMARY

GORGON EXTENSION

Fairpartner was in full swing, and the team were in full project management mode when Jumbo-SAL-Alliance was contracted for a transshipment job for TechnipFMC. Three pairs of manifold structures and various other equipment had to be transported to and transferred onto the Allseas’ OCV Fortitude for subsea installation.

The project involved the installation of subsea manifolds to accommodate new wells, infield flowlines and umbilicals to tie into the existing subsea infrastructure in the Chevron-operated Gorgon and Jansz-Io fields. Fairpartner was only one of our four J-Class vessels able to carry all the cargo in a single voyage and transfer it to the OCV in various sequences which was essential to this time-sensitive job. This flexibility was needed to optimise the client’s installation schedule and weather considerations.

Want to know more?

Contact our team on
solutions@jumbo-sal-alliance.com

Send project by email

    RELATED #OFFSHORE EQUIPMENT PROJECTS

    OFFSHORE EQUIPMENT

    Shipment of two carousels

    OFFSHORE EQUIPMENT

    88 modules from South Korea to Lake Charles

    Leave a Reply