Skip to main content
#OFFSHORE SERVICES

MANIFOLD
INSTALLATION

IN SHORT
VESSEL MV Lone
CARGO 1 pipeline protection cover
1 pipeline end manifold
WEIGHT 120 t
LOCATION Mediterranean Sea
PROJECT Hadera
SPECIALS
  • Collection of CPI from port and transportation to offshore location
  • Installation of the CPIs at water depths of 80 m and 120 m respectively
manifold installation
PROJECT SUMMARY

EXTENSIVE EXPERIENCE IN FLOATING CARGO LIFTING OPERATIONS

The growing challenges of meeting worldwide energy demands have led major oil and gas producers to increase exploration with a heavy emphasis on offshore infrastructure. With this global development, we have become increasingly involved in providing transportation solutions to complex (offshore) oil and gas projects. Our vessels’ large hold and deck capacities allow them to handle these types of installation projects extremely efficiently.

Type 183 HLV Lone proofed her strength whilst being involved in the installation of a 120 t manifold in the Mediterranean Sea. All client provided items, in this case a pipeline protection covers and a pipeline end manifold, were collected in port and transported to the required offshore location. The installation took place at water depths of 80 m and 120 m respectively.

Want to know more?

Contact our team on
solutions@jumbo-sal-alliance.com

Send project by email

    RELATED #OFFSHORE SERVICES PROJECTS

    OFFSHORE SERVICES

    Taiwanese offshore pile load test project

    OFFSHORE SERVICES

    Pile test & installation campaign

    Leave a Reply