Skip to main content
#POWER

TRANSPORT OF 80 MONOPILES &
40 TRANSITION PIECES

IN SHORT
VESSEL Multiple Jumbo vessels plus third party HLV and deck carriers
CARGO 80 monopiles (in full or in 3 sections per pile)
40 transition pieces
POL Nordenham and Flushing
POD Mai Liao or Anping
PROJECT Yunlin Offshore Wind Farm
SPECIALS
  • 22 Consecutive voyages
  • Turn-key solutions provider for contracted scope of work
  • In-house engineering of loadspreading for any mode of transport used
  • Grillage and seafastening designed based on no weather limitations
  • Responsible for fabrication of the required grillages and supports
  • Full logistical management
  • Shallow draft at Nordenham
  • Optimised vessels intake / reduce number of sailings required.
  • Covid-19 challenges
  • “Best for project”mentality
  • Full transparency
Yunlin Offshore Wind Farm
PROJECT SUMMARY

YUNLIN OFFSHORE WIND FARM

This project was our time to shine in the offshore wind transportation and installation space, representing a significant milestone for us as the largest job in the history of Jumbo. The transportation part of our Transport & Installation contract for the Yunlin offshore wind farm in Taiwan has been completed. We mobilised ships from our own heavy lift vessel fleet, together with subcontracted deck carriers and HLVs from third parties, to transport the 40 monopiles, 120 monopile sections and 40 transition pieces (TPs) from yards in the Netherlands and Germany to Taiwan. We also took care of the project management of numerous critical aspects of the project including the engineering, design and fabrication management of the supporting and sea-fastening elements such as cradles, grillages and load spreader beams, procurement of additional equipment and services, as well as the chartering of third party vessels.

Want to know more?

Contact our team on
solutions@jumbo-sal-alliance.com

Send project by email

    RELATED #POWER PROJECTS

    POWER

    Shipment of 56 tower sections

    POWER

    Transported 87 transition pieces and 87 monopiles

    POWER

    Transporting wind farm equipment, including offshore foundations, blades and tower sections

    Leave a Reply